Language:
English
 
 
     
     

Our Products

 Aluminum Frames 11K
 HTS Frames 10K
 MEGA Shores
 MODUDECK System
 A-Frame Fly Forms
 Sky Lift
 WH-750 Wall Forms
 STERLING Wall Forms
 Climbing Formwork
 JB-240

 ALPAN Wall Forms
 ALPAN Column Forms
 STERLING Column  Forms
 Self Climbing Hydraulic  Forms
 Climbing Formwork JB-240
 Convenience and Safety

<< Previous | Page: 1 - 2 |

 

CLIMBING SEQUENCE WITH CLIMBING FORMWORK JB-240

Step 1:

Positioned wall form panel with pilot anchor attached supported by wall braces.

Proceed with first concrete pour.

Step 2:

After concrete reaches required strength, remove wall form. Attach pedestal support bracket and place jumpform brackets JB-240 on it. Install pilot anchor on wall form panel.

Proceed with second concrete pour.

Step 3:

After concrete reaches required strength, retract wall form panel and attach pedestal support bracket.

Step 4:

Lift Climbing Formwork JB-240 with crane, to next section.

CAUTION
Safe working load of lifting eye is 1900 kg (4200 lbs).

Step 5:

Place Jumpform Bracket JB-240 on pedestal support bracket and lock in position with safety bolt.

Install tension cable to secure climbing wall form before workers are allowed to use platform areas.

Place re-bar and prepare plywood surface for next concrete pour.

Step 6:

Move wall form panel forward with pilot anchor in place and proceed with concrete pour.

Continue following Step 3.

<< Previous | Page: 1 - 2 |