Language:
English
 
 
     
     

Our Products

 Aluminum Frames 11K
 HTS Frames 10K
 MEGA Shores
 MODUDECK System
 A-Frame Fly Forms
 Sky Lift
 WH-750 Wall Forms
 STERLING Wall Forms
 Climbing Formwork
 JB-240

 ALPAN Wall Forms
 ALPAN Column Forms
 STERLING Column  Forms
 Self Climbing Hydraulic  Forms
 Self Climbing Hydraulic Forms
 Performance and Simplicity

SELF CLIMBING HYDRAULIC FORM (SCHF) was used for construction of an entire core on a fourty-nine story high rise.

Project:

One Wall
Hotel & Residential Tower
1001 Hornby Street
Vancouver, B.C.
Canada

Project Owner:
Wall Financial Corporation

General Contractor:
Siemens Development Ltd.

Forming Contractor:
Loewens' Construction Ltd.

Self Climbing System allowed concrete forming contractor, Loewens' Construction Ltd., to pour floor slab and core wall forms on the same slab in one day instead of four.

Four cylinders with a single stroke of up to 12 feet, lift the entire outside and inside 135,000 lb wall form system, 76’-9” long by 21’-0” wide, at the speed of 2 ft/min.